Awaab’s Law Phase 2 starts on 30 November 2026. See which hazards London landlords must make safe within 24 hours and how to prepare your repairs service now.
On 30 November 2026, the rules that have governed damp and mould since October 2025 will cover far more of your housing stock. Awaab’s Law Phase 2 adds seven new hazard categories, and the clock is the same: some hazards need action within 24 hours.
Many of these hazards already reach your repairs team as ordinary jobs. A dead boiler, a scorched socket or a loose stair rail used to be routine. From 30 November, a late response can become a legal breach.
This guide explains what changes, what the timescales mean in practice, and what London housing associations and local authorities should do before the deadline.
What Is Changing Under Awaab’s Law Phase 2
Phase 1 came into force on 27 October 2025. It covers damp and mould, plus all emergency hazards. Phase 2 extends the same duties to seven more hazards where they present a significant risk of harm.
The new categories are:
- Electrical hazards
- Falls, including falls on the level, on stairs and between levels
- Fire and explosions
- Excess cold
- Excess heat
- Structural collapse and falling elements
- Domestic hygiene, including pests, refuse and food safety
The rules apply to local authorities and registered providers in England. The government has also said it intends to extend Awaab’s Law to the remaining housing hazards, other than overcrowding. So Phase 2 is a stepping stone, not the end point.
The Timescales Landlords Must Meet
The structure matches Phase 1. Two tiers matter.
Emergency hazards: 24 hours
If a hazard poses an immediate risk to health or safety, you must investigate and make the home safe within 24 hours of the report. This applies to any in-scope hazard, not just damp and mould.
Significant hazards: working day deadlines
For significant hazards, the Phase 1 pattern applies. You investigate within 10 working days and give the resident written findings shortly after. Where a significant hazard is confirmed, you must make the home safe within five working days.
The only defence to an alleged breach is that you used all reasonable endeavours. That makes records as important as repairs. We cover this below.
What Could Count as an Emergency Hazard
The government’s separate hazards guidance sets out how to triage reports, so read it before you write your process. As a guide, these situations could meet the emergency threshold, depending on the risk:
- Exposed live wiring or a repeatedly tripping consumer unit
- A heating failure in cold weather, especially where a resident is vulnerable
- A fire alarm failure in a block with shared escape routes
- A loose stair balustrade or collapsed step
- Falling masonry, a bulging ceiling or a failing chimney stack
Electrical hazards often overlap with fire risk. The guidance suggests a common sense approach: make the hazard safe first, whatever label it received at the start.
Why Repairs Teams Will Feel This First
Phase 2 takes hazards that make up a large share of a typical responsive repairs workload and gives them statutory deadlines for the first time. The timing adds pressure. Cold weather drives heating failures, and it also drives the condensation behind winter damp and mould reports.
Preparedness looks thin. A Housemark report found only 4% of landlords describe themselves as very prepared. If your contractor cannot reach a property within 24 hours, with the right skills and materials, you carry the risk.
Five Steps to Prepare Before 30 November
1. Triage every report against the new hazard list
Update your repairs triage so call handlers recognise the seven new categories. Train staff to ask about vulnerable residents, and record the answers. A consistent classification decision is your first line of evidence.
2. Secure a genuine 24 hour response
Check your contractor’s out of hours cover. Ask how many electricians, heating engineers and general operatives can reach a London borough at 2am. Ask what they carry in the van. A first-visit fix matters more now, because a second visit can blow the deadline.
3. Join up your compliance work
Electrical safety rules for social landlords took effect for new tenancies in November 2025 and existing tenancies in May 2026, with inspection and testing of installations. Use those inspection results to find defects before residents report them. Do the same with fire risk assessments.
4. Build an evidence trail
Log the time of each report, the triage decision, the visit, the findings and the make-safe action. Keep photos and operative notes. If a case reaches the Ombudsman or a court, this record shows your reasonable endeavours.
5. Reduce hazards at source
Responsive speed will not fix ageing components. Heating systems at end of life, failing roofs, poor insulation and cracked structural elements keep producing hazards. A funded planned maintenance programme cuts the number of 24 hour emergencies you face in the first place.
Where Planned, Void and Structural Works Fit
Several Phase 2 hazards have direct planned works answers.
Excess cold points to heating renewals, loft and wall insulation, and window replacement. Excess heat points to ventilation and shading in top floor flats. Falls point to stair repairs, handrails and communal area works. Structural collapse and falling elements point to lintel replacement, crack repair, chimney work and external wall repairs.
Void properties give you a second lever. A void is the cheapest time to clear electrical, fire and structural defects before the next tenancy starts. A void standard that checks every Phase 2 hazard stops problems moving to the next resident.
How Precise Enterprise Supports London Landlords
Precise Enterprise works with housing associations and local authorities across London. Our services map directly onto Phase 2 compliance:
- Reactive maintenance with 24/7 emergency response
- Planned maintenance programmes, including kitchen and bathroom renewals
- Void property refurbishment to a compliance-led standard
- External and structural works
- Resident liaison on occupied estates
We build programmes around your stock data, your triage rules and your reporting needs. That gives you speed when something fails and fewer failures over time.
Get Ready Now
Awaab’s Law Phase 2 starts on 30 November 2026, at the beginning of winter. Landlords with a clear triage process, reliable 24 hour cover and a planned works pipeline will cope. Those without them will face breaches, complaints and avoidable cost.
Contact Precise Enterprise to discuss your reactive and planned maintenance arrangements before the deadline. We cover all London boroughs.